Real jobs, photographed and filmed by the team that did them. From the membrane going down to the final trowelled finish, this is what an Advance Interiors floor package looks like on site.
A 40 square metre floor package across the two new rooms of a school extension in Urmston, Manchester. The team laid a 1000 gauge visqueen damp proof membrane across the sub-base, then a 50mm Retanol fast-drying screed, barrowed in, spread and hand trowelled dead flat, ready for its floor finish.





