A 65 square metre floor package in a new build at Bolton le Sands, Lancashire, laid over underfloor heating. The heating loops were clipped down over the floor insulation and separating layer, with the edge strip run round the perimeter of every room, then the floor was poured in fibre reinforced screed at an average 85mm and closed up flat, ready for its floor finishes once it has dried.









Priming, liquid screed and sand and cement walkways for three new padel courts in a converted steel factory.

A 90 m² external balcony laid to falls in Retanol fast-drying screed on a new build in the countryside at Pott Shrigley, Cheshire.

40mm Retanol fast-drying screed over a visqueen membrane in a new glass summer room extension in Bromley Cross, Bolton.