A new glass summer room extension on a house in Bromley Cross, Bolton. The team prepped the floor with a visqueen membrane laid across the slab and lapped up the perimeter, then poured a 40mm Retanol fast-drying screed, spread and hand trowelled dead flat under the glass roof, ready for its floor finish once dried. A small floor, but one the homeowner will look at every day, so the finish had to be right.






A 65 m² fibre reinforced screed floor package laid over underfloor heating in a new build at Bolton le Sands, Lancashire.

Around 1,400 m² of fibre screed over underfloor heating, Retanol balconies to falls and a 90mm garage floor in a large new build in Hale, Cheshire.

A 40 m² floor package for a school extension in Urmston: 1000 gauge visqueen DPM and a 50mm Retanol fast-drying screed, hand trowelled flat.