A new glass summer room extension on a house in Bromley Cross, Bolton. The team prepped the floor with a visqueen membrane laid across the slab and lapped up the perimeter, then poured a 40mm Retanol fast-drying screed, spread and hand trowelled dead flat under the glass roof, ready for its floor finish once dried. A small floor, but one the homeowner will look at every day, so the finish had to be right.






Priming, liquid screed and sand and cement walkways for three new padel courts in a converted steel factory.

A 90 m² external balcony laid to falls in Retanol fast-drying screed on a new build in the countryside at Pott Shrigley, Cheshire.

A 65 m² fibre reinforced screed floor package laid over underfloor heating in a new build at Bolton le Sands, Lancashire.