An old steel factory turned into a padel venue, with three new courts at Pinks Padel & Social. Advance Interiors carried out the floor preparation and screeding: the existing slab was cleaned down and primed, a liquid screed was poured across the hall to level pins, and sand and cement screed was laid for the walkways. The result is a flat, level floor across the whole building, ready for the courts to be fitted.







A 90 m² external balcony laid to falls in Retanol fast-drying screed on a new build in the countryside at Pott Shrigley, Cheshire.

40mm Retanol fast-drying screed over a visqueen membrane in a new glass summer room extension in Bromley Cross, Bolton.

A 65 m² fibre reinforced screed floor package laid over underfloor heating in a new build at Bolton le Sands, Lancashire.