Home.Projects.Liquid screed for three padel courts, Pinks Padel & Social
Featured Project 01 . Floor Screeding . Commercial Leisure

Liquid screed for three padel courts, Pinks Padel & Social.

An old steel factory turned into a padel venue, with three new courts at Pinks Padel & Social. Advance Interiors carried out the floor preparation and screeding: the existing slab was cleaned down and primed, a liquid screed was poured across the hall to level pins, and sand and cement screed was laid for the walkways. The result is a flat, level floor across the whole building, ready for the courts to be fitted.

Venue
Pinks Padel & Social
Building
Former steel factory
Screed
Primed, liquid screed
Walkways
Sand and cement
The empty steel factory hall at Pinks Padel & Social with the existing slab cleared ready for preparation
FP 01 . The Hall . Slab Cleared
Primer going down on the existing concrete slab ahead of the liquid screed
FP 02 . Priming . Before The Pour
Liquid screed being poured to level pins along the edge of the padel hall
FP 03 . Liquid Screed . Poured To Level Pins
Advance Interiors screeder working the wet liquid screed to release air and level the surface
FP 04 . Working The Screed . Levelling Off
Freshly poured liquid screed across the full length of the padel hall
FP 05 . The Full Pour . Wall To Wall
The liquid screed drying out across the padel hall ready for the courts
FP 06 . Drying Out . Ready For The Courts
On video

The job start to finish, in one reel.

FV 01 . Prep, Prime, Pour . Sand And Cement Walkways
More projects

Other floors we have laid.

All projects

Contact

Get a free quotation.

Phone 
Email 
Tom  
Jordan  
Kyle 
Based in BoltonWorking nationwide
Advance Interiors project photo