Home.Services.Finished Floors
Finished Floors . Bolton & Nationwide

Carpet, tile and LVT

The floor finished by the same team that laid what is underneath it. Carpet, tile, LVT and engineered plank supplied and fitted, straight onto a base we know is flat, dry and ready, because we put it there.

Plank flooring fitted out through a finished room, Advance Interiors
Plank flooring fitted out through a finished room
What is included

Every floor covering, covered.

LVT and vinyl plank

Luxury vinyl tile and plank fitted to a properly prepared base, with the sub floor made good first so the joints sit flat and stay flat.

Tile and stone

Floor tiling over screed and over underfloor heating, with the right adhesive, movement joints where they belong, and a set out worked from the room rather than from the door.

Carpet fitted

Carpet and underlay supplied and fitted, doors eased where they need it, and the room left usable at the end of the day.

Engineered wood

Engineered plank floated or bonded to suit the base and the heating below it, acclimatised before it goes down instead of straight off the van.

Sub floor prepared first

Moisture tested, levelled and primed before a covering goes near it. Most flooring failures are a sub floor problem wearing the covering as a disguise.

One team, one guarantee

When the same outfit lays the slab, the screed and the covering, there is nobody to point at when something is not right. That is the whole idea.

Questions

Asked and answered.

Do I have to use you for the screed to get the flooring fitted?

No. Fitting out on a screed somebody else laid is fine, we will just check it first: levels, moisture and how sound the surface is. If it needs preparing we will tell you what that costs before we start rather than after the covering is down.

How flat does a floor need to be for LVT?

Flatter than most people expect. LVT is thin and it telegraphs everything under it, so ridges, trowel marks and dips show through as soon as the light is low across the floor. That is why the screed and the covering are worth having done by the same team.

Can you fit flooring over underfloor heating?

Yes, and it is routine. The heating has to be commissioned and brought back down before the covering goes on, and the product has to be rated for it. Tile is the best performer, LVT and engineered wood are both fine within their limits.

Do you supply the flooring or do I buy it?

Either. We can supply and fit as one price, or fit material you have bought. If you are buying it yourself, tell us what it is before you order and we will flag anything that will not suit the floor it is going on.

How long before I can use the room?

Most coverings are usable the same day or the next. Tile needs the adhesive and the grout to go off first, so that is normally a day before foot traffic and a bit longer before heavy furniture goes back.

Coverage

Finished Floors, nationwide.

Based in Bolton, working across the North West as a matter of course and taking planned work anywhere in the country.

Planning a floor covering?

Free quotations . One team . Fully managed
Call us
Contact

Get a free quotation.

Phone 
Kyle 
Email 
Based in BoltonWorking nationwide