Straight answers on screed, underfloor heating, drying times and what actually goes wrong with floors, from the team that lays them.
Cementitious liquid screed is pumped in as a flowing, self-levelling cement-based mix instead of being laid and trowelled by hand.
Read moreFloor screed is the level layer that sits between your structural floor and the finished carpet, tile or LVT.
Read morePumped liquid screed has become a common choice for floors in and around Bolton, especially where underfloor heating is going in.
Read moreMost people asking how long screeding takes in Bolton want a straight answer before they book tradesmen or line up flooring fitters.
Read moreIf you're planning an extension, a kitchen refit or underfloor heating in Bolton, you'll need to budget for screeding, and the quotes you get can look very different from each other.
Read moreShort answer: if you are laying a new concrete floor in a heated room, yes, and building control will expect to see it.
Read moreIf you're extending a terrace in Halliwell or fitting underfloor heating in a new build in Horwich, you'll have to decide between a traditional dry screed and a liquid wet screed.
Read moreAsk three screeders for a price and you can easily get three very different figures, which makes it hard to know whether you are being looked after or taken for a ride.
Read moreYour screed looks dry and you can walk on it, so it's natural to want the new floor down straight away.
Read moreIf you are pricing up a new floor, an extension or underfloor heating, screeding is one of those costs that is hard to pin down from a quick search.
Read moreUnderfloor heating only performs as well as the screed sitting on top of it.
Read more