Cementitious liquid screed is pumped in as a flowing, self-levelling cement-based mix instead of being laid and trowelled by hand. For many Stockport projects, from a rear extension on a terrace to a new commercial unit, it saves time and gives a flatter floor. It isn't the right choice for every job, though. This guide covers where it works well, where it doesn't, and what to ask installers before you book.
Liquid screeds come in two main types. Calcium sulphate (anhydrite) screeds are gypsum-based. Cementitious liquid screeds use cement as the binder, so they behave more like a traditional sand and cement screed once they have set, but they are still poured and level themselves.
The cement base matters for practical reasons. Cementitious liquid screeds are generally more tolerant of moisture, so they suit kitchens, utility rooms and some wet areas. They usually work with standard cement-based tile adhesives, and many products don't need the surface laitance sanding off that anhydrite screeds often do before flooring goes down. Always check the specific product's data sheet, because formulations vary between manufacturers.
The biggest gains come with underfloor heating and larger areas. Because the mix flows around the pipes, it leaves no air pockets, which improves heat transfer. A floating liquid screed over insulation and heating pipes is often laid at around 40 to 50mm total depth, where a hand-laid sand and cement screed over the same system would typically be 65 to 75mm. That saves weight and floor height, which helps when you are matching an existing floor level in an older house.
Speed is the other draw. A pump can lay several hundred square metres in a day, so it suits open-plan ground floors, new builds and commercial units on a tight programme.
A pump setup has a fixed cost and a minimum volume, so a single small room can work out poor value compared with a hand-laid sand and cement screed. Floors that need falls to a drain, such as wet rooms or some commercial washdown areas, are also harder to form with a self-levelling material. Where weight or wet trades are a problem, for example on timber upper floors, a dry boarded screed system is often the better answer.
Basements need extra thought. Over a tanked basement, the screed has to protect the waterproofing and the detailing at the edges has to be right, whatever screed type you choose.
Drying is where people get caught out. Many cementitious liquid screeds take light foot traffic after 24 to 48 hours, but being dry enough for LVT, timber or carpet is a separate question. Standard mixes can take several weeks depending on depth, ventilation and the time of year. Fast-drying products such as Retanol can shorten this a lot, which helps when flooring dates are fixed. A moisture test before flooring goes down is sensible on any job.
As a rough guide, liquid screed is often priced somewhere between £15 and £30 per square metre laid, but that depends on depth, total area, access for the pump, the product chosen and whether the insulation and edge detail are included. Small jobs usually carry a minimum charge. Treat any figure as a starting point until someone has seen the site.
Good preparation decides how a liquid screed turns out. The membrane has to be lapped and taped so the mix can't leak through, an edge strip has to go round every wall to allow for expansion, and underfloor heating pipes have to be fixed down firmly so they don't float when the screed goes in.
It also helps when one team handles the whole build-up, from insulation and heating to screed and final floor, so nobody is passing blame between trades if a level or moisture reading is off.
No. The screed needs time to cure first, often around seven days for cementitious products, followed by a gradual warm-up. Follow the screed manufacturer's commissioning guidance for the product used.
It can be, but pump setup costs and minimum volumes mean a hand-laid sand and cement screed is sometimes better value for one small room. It is worth getting both options quoted.
Usually yes, once it has dried to the moisture level the tile adhesive maker specifies. Cementitious screeds generally work with standard cement-based adhesives, but check the screed data sheet first.