A 40 square metre floor package across the two new rooms of a school extension in Urmston, Manchester. The team laid a 1000 gauge visqueen damp proof membrane across the sub-base, then a 50mm Retanol fast-drying screed, barrowed in, spread and hand trowelled dead flat, ready for its floor finish.







Priming, liquid screed and sand and cement walkways for three new padel courts in a converted steel factory.

A 90 m² external balcony laid to falls in Retanol fast-drying screed on a new build in the countryside at Pott Shrigley, Cheshire.

40mm Retanol fast-drying screed over a visqueen membrane in a new glass summer room extension in Bromley Cross, Bolton.