Home.Projects.School extension floor, Urmston
Featured Project 04 . Floor Screeding . Commercial

School extension floor, Urmston.

A 40 square metre floor package across the two new rooms of a school extension in Urmston, Manchester. The team laid a 1000 gauge visqueen damp proof membrane across the sub-base, then a 50mm Retanol fast-drying screed, barrowed in, spread and hand trowelled dead flat, ready for its floor finish.

Location
Urmston, Manchester
Floor area
40 m²
Membrane
1000g Visqueen DPM
Screed
50mm Retanol
Finished 50mm Retanol screed trowelled smooth across the school extension floor
FP 01 . Finished Screed . Trowelled Flat
Screed being hand trowelled to a flat finish inside the extension
FP 02 . Hand Trowelling . Final Pass
Semi dry screed barrowed in and spread across the membrane
FP 03 . Screed Going In . Over The DPM
Screed spread and ruled off across the first of the two rooms
FP 04 . Ruled Off . Room By Room
School extension with fresh screed floors curing through both rooms
FP 05 . Both Rooms . Curing
On site at the school extension in Urmston before the screed goes down
FP 06 . On Site . Urmston
On video

The job, as it happened.

FV 01 . Screed Arriving On Site
FV 02 . DPM Down . Ready For Screed
FV 03 . Walkthrough . Screed Down
FV 04 . The Team . Barrowing In
More projects

Other floors we have laid.

All projects

Contact

Get a free quotation.

Phone 
Email 
Tom  
Jordan  
Kyle 
Based in BoltonWorking nationwide
Advance Interiors project photo